The final electrical inspection certificate was awarded on October 14. Jacki calculated the design load for the house, laid out the service panel, and kept a detailed notebook of all electrical diagrams and circuits. Kevin made all of the final connections in the service panel. There is a whole house surge protector and a transfer switch for a generator, in addition to 1" conduit and ample space for a future solar inverter. The house has 100% LED lighting, inside and out, and there are plenty of receptacles on each wall. Cardboard secured with Frog tape is an excellent way to protect freshly painted walls from being marred by switches dangling from the box.
|