All of the electrical work for the 200 AMP service panel was completed and inspected in late March; a joint effort well-done. The main cables were installed after inverting the panel, allowing a lot more room inside (with an okay from the electrical inspector BEFORE doing the install). Jacki completed all of the calculations, and designed the electrical layout for the entire house. Both Kevin and Jacki pulled all of the wires and labelled each one to eliminate confusion after drywall. Kevin did an awesome job wiring the panel, and creating ample space for the future inverter (solar panels).
|