After the OSB was installed on the ceiling, Zip tape was applied to the horizontal seams to create an impressive air barrier. Next came the interior wall plates - top and bottom - followed by the studs, 24" OC, to accommodate the future insulation. The framing doesn't look like much, but it entails careful measuring and placement of walls. We made a few tweaks, here and there, to improve the overall layout, but nothing major.
|