Jacki calculated all of the PEX runs and Kevin padded out the affected ceilings. After the manifold layout was draw and a plan of action determined, they pulled all of the lines (home runs) in a day and a half (over 1000'). The house water lines will be located between the insulated 10-1/2" wall, and within the heated space just below the ceiling. Our plumber buddy Todd hooked up Kevin's compressor to the PEX system and ran a compression test, which passed with flying colors. Todd installed the above floor drains, rough-in valves for the showers, 3/4" PEX to water pressure tank and hot water heater, and made the final connections in the manifold. Ready for Roxul.
|