With the power, cable and phones lines run through conduit from the service panel into the utility room location (center area of foundation), and the pitless adapter installed and water line run from the well, the trenches can be backfilled and graded.
|
Under the Sun Building and Remodeling, LLCCOMMITTED TO BETTER Archives
September 2022
Categories |