UNDER THE SUN BUILDING AND REMODELING, LLC
UNDER THE SUN BLOG
  • Blog
  • About
  • Contact

ROUGH ELECTRICAL and PLUMBING

4/30/2021

 
When running electrical cable and PEX tubing home runs, it is important to begin with a detailed plan on paper. The service panel and PEX manifold were designed, draw and labelled prior to installation. The service panel area allows for future installation of additional equipment, such as EV charging. Neatness and safety count. All cables were properly secured with cable stackers and staples; nail-on plates were used outside of the plenum in the ceiling. Every wiring circuit was verified for continuity prior to insulation. All PEX tubing was threaded through pipe insulation from the fixture to the manifold and pressure tested.

Comments are closed.

    RSS Feed

    Under the Sun Building and Remodeling, LLC

    COMMITTED TO BETTER
    Providing an energy saving alternative to traditionally built homes

    Archives

    January 2022
    December 2021
    April 2021
    February 2021
    January 2021
    July 2020
    April 2020
    September 2016
    July 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014

    Categories

    All

Powered by Create your own unique website with customizable templates.