When running electrical cable and PEX tubing home runs, it is important to begin with a detailed plan on paper. The service panel and PEX manifold were designed, draw and labelled prior to installation. The service panel area allows for future installation of additional equipment, such as EV charging. Neatness and safety count. All cables were properly secured with cable stackers and staples; nail-on plates were used outside of the plenum in the ceiling. Every wiring circuit was verified for continuity prior to insulation. All PEX tubing was threaded through pipe insulation from the fixture to the manifold and pressure tested.
|