Before constructing non-structural soffit, air seal with acoustical sealant or a first coat of tape - - or both, as Kevin did here. Begin with a 2x4 on one wall, then connect the dots with straight rips of drywall, which are leveled and plumbed. The soffit will then be ready for bull nose and tape.
|
Under the Sun Building and Remodeling, LLCCOMMITTED TO BETTER Archives
September 2022
Categories |