Siding!

4/28/2015

 
Siding has begun and the "reachable" areas can be applied quickly by an experienced builder. We selected CertainTeed Monogram premium vinyl siding for it's quality, durability and no maintenance future. There will be three Restoration Millwork faux posts, centered to each of the return gables in the front of the house, in addition to the two custom posts that will encompass the front porch. These aesthetic features will add dimension to the overall simple design, yet remain maintenance free.
Picture
Picture
Picture
Picture
The overhead door was installed on 4/24/2015 by Adirondack Overhead Door. It is a Raynor Centura R18 insulated fiberglass door (Carriage House style with bean hardware) and a Chamberlain (of course!) LiftMaster opener.
Picture
This particular door opener can be used for commercial and residential overhead doors, and is located adjacent to the opening, on the wall instead of the ceiling. After some extensive research, we selected this model (Chamberlain Liftmaster 3900) because its phantom load (electricity used when in standby mode) is only 1 watt per day. Some openers can use as much as 25 watts in standby, which folks want to avoid, especially those building net zero homes!

Drywall Completed

4/24/2015

 
The inside was buttoned up in time for the "under construction" open house on Sunday, April 26. We had a lovely time chatting with family, friends and neighbors about our super energy efficient  home. Many thanks to those who attended. The next open house will be upon completion, so stay tuned.
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture

Interior Insulation

4/22/2015

 
Three layers of R15 Roxul have been applied to the exterior walls for a total of R45. The interior walls have one layer of R15. Drain lines, PEX and wiring have been surrounded by insulation as well. Needless to say, it is very quiet in the house. The insulation inspection passed without issue.
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Above, structural metal inside corners are utilized for drywall, allowing insulation into the corners of a room (instead of studs). Left, ceiling boxes for lighting have been foamed in the attic and caulked from below. During the blower door test, the only bit of air was felt around the electrical ceiling boxes - in our collective opinion, the weakest leak, despite their small size and foam "helmut". The issue will be remedied, according to the builder, before the final blower door test.

Drywall installation begins tomorrow ...

Energy Star Celebrates 20th Anniversary 

4/21/2015

 
The ENERGY STAR label was created in 1992. The voluntary energy efficiency program began with computer and printer labeling, but fully expanded in 1995 to include heating and cooling systems, major appliances, lighting, office equipment, electronics, and ENERGY STAR labeled homes.  Under the Sun is pleased to be constructing its first, 20th anniversary ENERGY STAR certified home in Greenwich, NY.

Initial Blower Door Test - 1.13 ach50

4/20/2015

 
Our energy rater Matt Evans (from Newport Ventures) was here this afternoon to complete the thermal enclosure checklist for ENERGY STAR and run the initial blower door test on the house. ENERGY STAR Version 3 requires homes to have a rating of 4.0 or less air exchanges per hours (ach) at 50 pascals. The test was set up at the front door with all remaining doors and windows closed. The purpose of a blower door test is to determine air leaks in the building envelope. Having the test completed before drywall ensures that any potential leaks can be mitigated. And the results are in:  The cottage scored 1.13 ach50, which is pretty darn good. Passive House (Passiv Haus), which has the highest standard in the country, is .06 ach50.  Cheers to the builder!
Picture
Picture
Picture
Picture
Picture

Spring … at Last!

4/19/2015

 
Picture
Picture
Picture
Picture
Picture
The snow is gone. The ice has melted. Bits of green are starting to pop up. Spring is here - - hooray! Mr. Robin (above) visits the sliding glass door every morning. With his beak to the glass, he dreams of building a nest in a net zero home. (Good luck with that.) 

Coming soon - - siding!

New Biz Sign!

4/19/2015

 
Picture
Now located in the front yard - - look for it!

Drywall the Garage 

4/18/2015

 
A great big thanks to Josh for driving from Milton, VT early AM to help Kevin install the drywall in the garage. Why sheetrock the garage before the rest of the house? Answer: To create an air seal between the attached garage and heated space inside the house. This needed to be done before the initial blower door test could be performed. Energy rater Matt Evans will be here Monday afternoon to complete the ENERGY STAR thermal bypass checklist and complete the blower door test. Drywall delivery is schedule for Tuesday and will be installed this coming week.

Special Note: We are sincerely grateful to all of our suppliers for hanging in there with us, through the long, cold winter, and into spring. Our next draw is coming soon! Thanks, guys.
Picture
Picture

Interior Insulation

4/17/2015

 
Picture
Picture
Picture
Picture
There are 3 layers of Roxul insulation on the outside walls and around the perimeter between the attached garage. The first and last layer goes on vertically, with the inside "meat" of the sandwich applied horizontally. The batts are rigid, easy to work with, and reduce coughing and itching by about 80% (when compared to fiberglass).
Picture
Picture
3 layers of insulation behind the master shower, combined with an air sealed wall, adds additional comfort.
The original surround for the tub was shipped with the wrong size in the right box. One week later, the rough-in was completed.

Pex, Pex and More Pex

4/17/2015

 
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture



















Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Jacki calculated all of the PEX runs and Kevin padded out the affected ceilings. After the manifold layout was draw and a plan of action determined, they pulled all of the lines (home runs) in a day and a half (over 1000'). The house water lines will be located between the insulated 10-1/2" wall, and within the heated space just below the ceiling.  Our plumber buddy Todd hooked up Kevin's compressor to the PEX system and ran a compression test, which passed with flying colors. Todd installed the above floor drains, rough-in valves for the showers, 3/4" PEX to water pressure tank and hot water heater, and made the final connections in the manifold. Ready for Roxul.
<<Previous

    RSS Feed

    Under the Sun Building and Remodeling, LLC

    COMMITTED TO BETTER
    Providing an energy saving alternative to traditionally built homes

    Archives

    January 2022
    December 2021
    April 2021
    February 2021
    January 2021
    July 2020
    April 2020
    September 2016
    July 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014

    Categories

    All

Powered by Create your own unique website with customizable templates.