The sheathing was completed on Thursday, October 2.
Next up - - Construction of the second 2x4 wall, which will be located inside the house perimeter, creating a 10-1/2" thick wall that will be filled with insulation (R45). The trusses were ordered on October 1 and are due around October 9.